The Swedish company Climeon wanted to further develop its 150 kW ORC power plant technology into a modular system. The aim of the project was to accommodate Climeon's ORC technology and all directly related mechanical and electrical systems in a shipping container. This includes the hot and cold side piping, compressed air, air handling systems, all located on a common steel frame with the control technology and electrical switchgear.
During the design phase, Arctic Green Engineering Services Ltd. (formerly Mannvit Ltd.) was responsible for concept design, detail design, production support and product development.